Do we need planning permission?
Usually not for panels on the roof of a commercial or farm building. Listed buildings and some conservation areas do need it, and we check before you commit.
Can the panels go on the ground instead of a roof?
Yes. Ground-mounted arrays suit farms and sites with spare land, or a roof that's too weak or shaded. They can need planning permission, which we check before you commit.
How long does G99 approval take?
It depends on the network operator and the size of the system, from a few weeks to a few months on busier parts of the network. We apply as soon as the design is agreed.
Can a business claim solar against tax?
Usually, through capital allowances. Your accountant will confirm what applies to your business.
Is a battery worth it for a business?
If a lot of your power is used after dark, often yes: clubs, pubs and farms with evening loads. If you mostly use power in the day, panels alone usually make more sense. Your meter data shows which.
Do you work with three-phase supplies?
Yes. Most commercial sites have one, and both clubs above run on 30kW three-phase hybrid inverters.
Can we sell the power we don't use?
Yes. Smart Export Guarantee tariffs are open to businesses as well as homes, through an energy supplier.
Can you fit EV chargers for staff or vans?
Yes, workplace chargers fitted alongside the solar, so daytime charging can run on the roof's power.
Do you cover farms and businesses across Somerset?
Yes: Wells, Glastonbury, Frome, Bridgwater, Yeovil, Taunton and Bath. The same team throughout.